Wayland High School Building Committee

About the Project

 
 

Reports

Status Report to MSBA, May 2010

Status Report to MSBA, April 2010

Status Report to MSBA, March 2010

Status Report to MSBA, February 2010

Status Report to MSBA, January 2010

Status Report to MSBA, Dec. 2009

Status Report to MSBA, Nov. 4, 2009

Feasibility Study Report, June 2009 and Existing Conditions Report, May 2004

Wayland High School Visioning + Educational Specifications, Frank Locker Draft Report (Futures Team)   • Full ReportTable of Contents   • Cover   • Ch 1:  Executive Summary   • Ch 2:  Project Organization   • Ch 3:  Ed Vision   • Ch 4:  Ed Specs   • Ch 5.1.1   • Ch 5.1.2   • Ch 5.1.3   • Ch 5.2.2   • Ch 5.2.3   • Ch 5.5   • Wayland:  21st C. Schools Presentation

Project Documents

  1. Shawmut LOA, April 8, 2010

  2. Project Funding Agreement, executed Jan. 29, 2010

  3. RFQ for CM at Risk, Ad for CM at Risk, December 2009

  4. Conservation Commission Filing:  Abbreviated Notice of Resource Area Delineation, Dec. 4

  5. Fact Sheet:  Ballot Question/Warrant Article Language, Nov. 9, 2009

  6. Fact Sheet:  Alternative Projects, Oct. 31, 2009

  7. Fact Sheet:  Proposal Summary, Oct. 21, 2009, one page handout

  8. Schematic Design Plans

  9. View from the front of the building

  10. Aerial Perspective

  11. First Floor Plans

  12. Second Floor Plans

  13. Overall project budget, with reimbursement

    Floor plans now available as web pages and easier to view.


Educational Specification, revised July 16, 2009, approved by the HSBC and submitted to MSBA

Fact Sheet: Options Selection, July 2009 and Options Selection Site Plans

Owner's Project Manager and Designer (Architect) Selection, Spring 2009:    • Narrative of OPM Selection Process  • OPM Short List Interview Outline & Questions   • OPM Scoring & Ranking   • OPM RFS and Legal Ad   • Reference Questions for Designer Selection  • Designer/Architect Interview Questions & Evaluation   • High School Design Services Request for Quote   • MSBA Submission for Final Designer Selection

MSBA Enrollment Projection for Wayland, Spring 2009

Statement of Interest, August 2006

Voter Survey Report, January 2006

  1. Turner Report – 3 year plan for repairs, July 17, 2006   Part 1,  • Part 2, • Part 3, • Part 4, • Part 5, • Part 6, • Part 7, • Part 8, • Part 9, • Part 10

  2. Preliminary Design Report November 2004  •  Ch 1 Executive Summary  Ch 2 Goals and Priorities  Ch 3 Existing Conditions Analysis  Ch 4 Educational Programming  Ch 5 Town and School Departmental Input  Ch 6 Benchmarking  Ch 7 Three Preliminary Options  Ch 8 Selected Option  Ch 9 Sustainable Design Upgrades  Ch 10 School Funding and Public Construction Reform  Ch 11 Next Steps  Ch 12 Educational Program and Educational Program Narrative  Ch 13 Stop Gap Analysis

Presentations

October 2009 Public Forum Presentation in PPT, and available also as a PDF here

Sept. 21, 2009 Wayland School Committee Briefing, on MSBA Project Scope and Budget Agreement Conference

May 2009 Community Forum:  Educational Vision and Specification, Design Concepts and Options

November 2008  Enrollment Presentation to MSBA

January/February 2007  Update on WHS, Request for Design Funding

 December 2004/January 2005:  Presentation of Preliminary Design, Request for Detailed Design Funds  Introduction  •  The Need  •  Finance

August 2004 Community Forum 3:  Options, Cost Analysis and Selected Approach     Introduction   •  School Building Assistance   • HMFH   • Analysis and Options   • Financial Analysis   • Program Priorities

July 2004 Community Forum 2:  Existing Conditions, Design Process  Introduction   • General Presentation

Press Releases

June 10, 2010:  Dates for Groundbreaking, summer Community Update

Jan. 28, 2010:  Project Status Update

Nov. 9, 2009:  Letter to the Crier, MSBA response to questions about budget cuts

Sept. 30, 2009:  MSBA Approval of Project, Forum Dates

Sept. 17, 2009:  Results of Project Scope and Budget Conference, Project Budget

Sept. 3, 2009:  Cost estimates, completed Schematic Design

August 13, 2009:  Review of MEP systems

July 29, 2009:  Preferred options selected, 40% reimbursement confirmed

July 16, 2009:  Ed Spec approved, Options Analysis begun

July 10, 2009:  Signed Feasibility Study Agreement

June 22, 2009:  Submission to MSBA

June 8, 2009  :  Design Options Selection

May 25, 2009  : Futures team, ed spec

April 27, 2009  :  academic space, MSBA update

April 20, 2009  :  design options

March 30, 2009 :  ed spec, design options

March 23, 2009 :  MSBA, model schools, ed spec

"One Step At A Time" by Eric Sheffels, March 12, 2009

"Historical Perspective on the Wayland High School Facility" by Fred Knight,  March 5, 2009

Legal Ad for Owner's Project Manager, June 25, 2008

HSBC Update, May 15, 2008

HSBC Update, February 14, 2008

“Wayland High School Selected by MSBA for Pilot Assessment”, June 20, 2007

“The High School Building Committee: A Fresh Start” by Jennifer Steel, April 5, 2007 

 “What to do about Falling Concrete at Wayland High School” by Eric Sheffels, March 26, 2007

 “Wayland High School: News from the State” by Representative Tom Conroy, March 11, 2007

 “Bringing Wayland High School into the 21st Century” by Lea Andersen, March 2, 2007

Click here for Building Plans