The following is an
overview of upcoming construction activities for the coming week:
We are
working Saturday 8/28 on excavation and backfill activities.
The
traffic light wiring was damaged last week and is being repaired on
Saturday 8/28. The light should be functioning properly again by mid-day
On Monday
8/30, we will paint the center stripe at the temporary roads and paint 'No
Parking' lines in the area behind the Fieldhouse (we
will cordon off this area so that cars are not parked there on Monday).
The
temporary parking lot and the pool parking lot have been striped and with
athletics underway, there is constant traffic on the temporary roads to the
parking areas. Please drive slowly and keep in mind that this road is for
two-way traffic. We are adding signage to help manage traffic on campus.
Throughout
the week, concrete foundation construction will continue, much the same as it has
for the past several weeks. Daily concrete placements and
ongoing footing excavation and backfill can be expected. Also within
the site, we are excavating for installation of new underground utilities.
Soils
continue to be trucked to/from the gravel pit adjacent to the lacrosse field,
so please be aware of truck traffic in that area. Everyone should keep in
mind that the gravel pit area is off limits to non-construction personnel.
We have posted signage to that effect.
We apologize for any
inconvenience resulting from these activities.
Regards -
Chris
CHRIS SEMLIES I LEED¨ AP I Shawmut Design and Construction