Thursday,
July 22, 2004
Wayland High
School
Language
Building L1
Attendees
HSBC members:
Lea Anderson, Josh Bekenstein, Dianne Bladon, Steve Breit, Brian Chase,
Mary Lentz, Joe Lewin, Cindy Lombardo, Steve Tise
Absent:
Jim Howard, Eric Sheffels
Ex Officio
members: Gary Burton,
Joy Buhler, Jay Chandler, Fred Knight, Allyson Mizoguchi, Charlie Ruopp
Turner team:
Julie Bezoetdebie, Bob Ho
HMFH team:
Steve Friedlaender, Doug Sacra
Call to order
- Chairman Lea Anderson
called the 20th meeting of the HSBC to order at 7:45 p.m.
Educational
Program Prioritization Ð Charlie
Ruopp introduced the discussion by saying that this exercise brings Òpassion
back into this processÓ. Our
educational responsibility is to a highly motivated group of students and a
first class staff with a mission to provide a rigorous and stimulating academic
environment. He asked for
guidance from the HSBC in determining the number of priorities that should be
presented. He then reviewed a
detailed draft that grouped the program into three major priorities.
Priority 1: Safety,
health and code compliance
(Science labs, air quality, chemical storage, fire standards, ADA, plumbing and
sewage treatment, roofs, Title 9, security)
Create core academic spaces (Math, Science, Social Studies, English,
Language, Special
Education) that are functional and adequate (State requirements)
Priority 2: Support the non-core academic programs (Music, Art, Drama, Guidance, Admin,
Metco, Media, Technology, Health/wellness, Physical Education, Academic Center,
Photography)
Maintain
Common facilities that support academic program and school culture (Cafeteria/Commons, office and
conference space for teachers, performance space, custodial/maintenance
storage, reference centers)
Support the extracurricular activities
at WHS (Athletics,
office/work space for student organizations)
Priority
3: Maintain the campus style environment of Wayland High School
Charlie
discussed possible changes to the educational program, but pointed out that
each one has ramifications that must be understood.
Questions and
comments followed:
-
How would no new auditorium and no new gym impact the program? Charlie responded that there is
currently no adequate forum for effective communication with the whole, or even
half of the student body. If there
were a large auditorium, then this communication would take place on a regular
basis (1 time/month or more) instead of only when there is a crisis. A larger performance space would allow
fewer performances of shows, lessening the burden on students during production
week. If an auditorium is not
included, then the defined use of the stage for regular drama classes and the
little theater for music space would have to be readdressed. Regarding the gym, the situation is
barely manageable now, but with the increasing enrollment there will be more
kids cut from teams without additional practice space. There could be severe compromises to
the indoor track program, for example, if the Field House were the only gym
space. The community has also
expressed a need for more gym space for Park and Rec. programs.
-
Why canÕt we use the Middle School auditorium for the high school program? Lea referred the HSBC to the recent
memo from Jane Ezbicki on this issue.
While the Middle School auditorium is a great improvement over the
cafetorium for performances, it is not up to the standard for a strong high
school theater and music program.
Many compromises were made to lower cost on the MS project resulting in
the lack of back stage space, stage space too small for large ensembles, no pit
area for musical orchestras or choral/orchestra works, no set construction, set
storage, costume storage, or prop storage space Ð all shortcomings the high
school project is addressing. Many
more reasons are stated in the memo.
It was suggested that this issue should be addressed very clearly, including
the benchmark data on other schoolsÕ auditoriums for posting on the website.
- If we did away with the indoor track and pushed the bleachers to the outside, could three competition gyms fit? Could we phase the project to build a gym later?
-
In order to reduce the scope of the project, we might find that getting rid of
lower ranked items might not save enough money.
-
Common area should have a higher priority. Charlie remarked that programmatically reducing common space
would be a big change, not one that he is willing to make.
-
The priority list is too detailed.
-
Our job is to know what we want the high school to be at the end of the
project, whether it takes four years or twenty years. Our responsibility is to the 10,000 students who will be
passing through WHS in the next 50 years.
-
The HSBC should clearly communicate the impact of reductions. If there is no auditorium, what does
that mean? Be very specific. A white paper would be helpful explaining
the compromises.
-
Is our purpose to consider a downsized ed program that will be permanent or to
guide a phased implementation plan?
Is there a way to relate the priorities to an architectural plan?
-
The HSBC does not need the prioritization much deeper than it is now. We are not ready to give up the whole
program yet until we see what it costs.
Making adjustments might result in a 10% change, but will not bring this
project to $30M.
-
Are we going to decrease the quality of the educational program? Look around at what other towns have.
Phasing - The group briefly continued its
discussion on phasing the project.
Questions and comments were:
-
Would phasing be continuous or stop and go?
- Questions have to be asked of the
inspectors regarding leaving some buildings as they are for the short term.
-
Can we put a price on addressing the bulk of academic core needs?
-
How much more expensive will a phased project be?
-
Easiest phased components might not be highest priority.
-
What are the funding implications of phasing?
-
Financial analysis of phasing must be done.
-
Minimal irrigation use because fields are so wet, topsoil deep
-
Students often wait to use showers at home
-
Energy use is reduced by lower than current code amounts of fresh air supplied
to many
occupied spaces Ð large savings, but illegal
-
Minimal air conditioning
-
Energy use would be lower if replaced single glazed windows, insulated walls
and roofs, replaced inefficient lighting, etc.
Doug modeled
utility costs for 3 schemes. The
most efficient case showed:
Scheme
1. $194,466 or $0.75 per
square foot per year
Scheme
2. $145,327 or $0.60 per
square foot per year
Scheme
3. $122,777 or $0.52 per
square foot per year
SBAB Ð Steve Friedlaender reported that three
bills have been sent to Governor Romney for his signature by the end of the
month. The bills address paying
off projects on waiting list, reforming public construction law, and
establishing a new agency to oversee funding of school construction. There were no details available on
grandfathering towns that proceed before July 2007 or on the rate of
reimbursement. HSBC members
expressed the need to understand the political and legal issues of the new
legislation. HMFH will send
legislation to Fred for posting to the website and report again next week as
more information becomes available.
The group
briefly discussed adding time to the schedule to make up for the additional
time leading to an option selection.
The group will wait for Dick Amster to discuss this further.
Upon a motion
duly made (Mary Lentz) and seconded (Steve Tise) the Committee voted
unanimously (9-0) to approve the minutes of HSBC meeting #19 on July 15, 2004.
The meeting was
adjourned at 10:20 p.m.
Observers:
Pat Abramson, Sherry Cohen, Mary Beth Finch, John Harper, Ian Hecker,
Zhi-Dong (John) Jiang, Anette Lewis, Peg Obermiller, Kathy Raskin, Charlie
Raskin, Linda Segal, Matt Shear, Kathy Siracusa, Molly Upton
Comments and
questions from observers:
Comment: Electricity use numbers do not make
sense for some months.
Question: How many students take
photography? Answer: 68 and more
would take it if they could.
Comment: Show data to community. It helps. Work with Fincom to show tax impact. Do not pit schools against rest of the
town.
Question: Are wetlands a problem? Answer: Would do a row of test pits.
Comment: Pleased that Charena Rd. residents
concerns have been registered with HSBC and architects. Also concerned with kids gathering near
houses, people parking their cars on Charena Rd. and septic odors from
treatment plant.
Comment: Given constraints of site, advise
meeting with DEP, water, health, conservation depts. soon.
Comment: Larger auditorium and larger gym have
environmental impact due to more cars.
Question: Would gasline be free? Where will irrigation well be located?
Question: How high does water get in 100 year
flood? If this site had nothing on
it where would buildings be constructed?
Question: How do schemes meet campus style? Comment: Kids like campus style.
The next regular meeting of the HSBC is scheduled for Thursday, July 29 at 7:30 p.m. in the School Committee Conference Room in the Town Building.