Welcome to the High School Building Committee (HSBC)

Option3 site

Existing Site
2004 Proposal
What's new? See Events and Chronology and Join the mailing list .
Introduction
This site contains materials on the modernization and expansion of the Wayland High School .  The project is overseen by the High School Building Committee (HSBC) .  The project (see History) was divided into 3 phases until the failure of the STM vote in January 2005.  A survey of public opinion about the project was conducted in 2005.  In 2006, the HSBC was given a supplemental charge by the School Committee and its voting membership was enlarged from 11 to 15 in preparation for responding to the new process of funding school projects being set up by the Massachusetts School Building Authority .  The recent activities of the HSBC are described in Lea Anderson's ATM report from April 2006 and below.  See more details in Events and Chronology.

Search this site
Events (cf. Agendas and Minutes ) Key:
Meeting  yyyy-mm-dd
Special Event
Public Forum
Date
Time
Location
Topics, Speakers, Comments
2007-06-28
8:00 pm
Town Building, WSC room
Here is the agenda for HSBC Meeting #49 to be held on Thursday, June 28 at 8 pm in the School Committee conference room on the second floor of the Town Building.
Note: the meeting is at the Town Building at 8pm (after the 7-pm Capital Planning meeting in the hearing room).
The latest presentation by the MSBA to Collectors and Treasurers dated June 2007 provides a useful update (pdf).  It can be found at:
http://www.massschoolbuildings.org/Downloads.htm.
2007-05-17
7:30 pm
WHS TBD
Meeting #48 
2007-04-29
1:00 pm
WHS Field H0use
Annual Town Meeting
2007-03-15
7:30 pm
WHS S2
Meeting #47 
2007-02-01
7:30 pm
WHS S2
Meeting #46  Agenda.  Note change of location; we will meet in the Science Building at the High School.
2007-01-18
7:30 pm WHS L9 Meeting #45  Agenda.  Note change of location; we will meet in the Language Building at the High School.  Following comments form the public, one topic is goal setting.
2007-01-04
7:30 pm
WHS L9
Meeting #44  Agenda.  Note change of location; we will meet in the Language Building at the HIgh School.  Following comments form the public, discussion will use the documents stored here.
2006-12-14
7:30 pm
WSC mtg rm
Meeting #43  Agenda.  Discussion will use these documents.  Campaign Finance Law.  HSBC 2004 Communications Plan .   2005 Town-wide Survey .   Draft of minutes – Meeting #42
2006-11-30
7:30 pm
WSC mtg rm
Meeting #42  
2006-11-16
7:30 pm
WSC mtg rm
Meeting #41  Agenda.  Discussion will use these documents.  Education Specification white paper Existing Conditions white paper MSBA Final Regulations (CMR963) Wayland's Statement of Interest sent to MSBA.  MSBA Process Flow ChartMSBA Timeline for Wayland (Draft) Room use at WHS for 2006-2007 school year
2006-10-26
7:30 pm
WSC mtg rm
Meeting #40  Agenda1989-1992 Renovations Minutes.

References and HSBC Materials
| Wayland High School (WHS): | home page | Site and building maps | 1989-1992 Renovations |
| High School Building Committee (HSBC, 2004-): | Agendas and Minutes | Press Releases | List server info List server archives (2006-) (2005) | HSBC Members | Contact Information | 8 July 2004 Public Forum | Supplemental Charge (April 2006) |
| High School Study Committee (HSSC, 2003): | report | home page | archives |
| High School Feasibility Study Committee (HSFSC, 2002): | summary | full report |
| State SBA funding reform: | Chapter 208 of the Acts of 2004: AN ACT RELATIVE TO SCHOOL BUILDING ASSISTANCE | Accompanying Funding bill Chapter 210 | Final version | House Bill No. 4749: html , pdf | Senate Bill (26 Jun 2004): text |
| Massachusetts School Building Authority (MSBA) | Wayland's Statement of Interest |
| Send comments to: | Webmaster |

Chronology
Event
Posting Date
Posted minutes of mtg#40 on 26 Oct 06 .  Posted agenda of mtg#42 on 30 Nov 06.
28 Nov 06
Posted revised version of  MSBA Process Flow Chart and MSBA Timeline for Wayland (Draft) .
Posted Allyson Mizoguchi's memo on room use for the 2006-2007 school year.
13 Nov 06
Posted Final version of Wayland's Statement of Interest that was sent to the MSBA in August 2006.  The SOI will be used by the MSBA as the starting point in the process of determining whether the WHS will be allowed reimbursement.  The entire process of selection of the WHS for reimbursement is detailed in the final regulations of the MSBA and diagrammed in material (pdf) put together by the HSBC .  The process will be discussed at the 16 Nov 06 meeting of the MSBA along with the educational specifications and existing conditions at the WHS developed by HMFH architects under contract to the HSBC in 2004 (before the failed Jan 2005 vote on the proposed expansion and renovation of the WHS).
5 Nov 06
Jean Tower, WPS Director of Technology, created the list serve for the Wayland High School Building Committee.  It is an informational list, open to the general public, with outgoing messages only.
To subscribe, visit the page: http://www.wayland.k12.ma.us/listserv/subscribe.html
To unsubscribe, visit the page: http://www.wayland.k12.ma.us/listserv/unsubscribe.html
The messages will be archived and may be viewed on the web at: http://listserve.wayland.k12.ma.us/read/?forum=hsbc
30 Oct 06
Meeting #40 on 2006-10-26.  Agenda1989-1992 Renovations 22 Oct 06
Meeting #39 on 2006-10-12.   AgendaMinutes. 10 Oct 06
Following interviews of candidates on 2006-09-26/28, new members appointed: Fred Knight, David Lash, Jennifer Steel, Karen Talentino 5 Oct 06
Due date for HSBC membership applications (html, pdf); extended from 14th to 28th of July ~10 Jul 06
MSBA public hearing on draft regulations on 2006-06-12.  Lea Anderson's report (pdf). ~1 Jul 06
The Wayland School Committee, along with the Board of Selectmen and the Finance Committee, is seeking up to four additional Wayland residents to join the current High School Building Committee (“HSBC”). These new members will be jointly appointed by representatives of the three committees and will continue and advance the HSBC’s mission to bring forward a proposed project for the revitalization and modernization of Wayland High School.  Press Release ApplicationSupplemental Charge
26 Jun 06
Posted minutes from meetings #34-#38 2006 ATM report , and MSBA statement by Lea Anderson (pdf) .
27 Jun 06
Project Overview: Phases (pre-2006)
  1. Phase 1 (Preliminary Design, Feb-Nov 2004): The charge to the HSBC for phase 1, which began in February 2004, is to determine the most cost-efficient solution for the facility needs of Wayland High School necessary to house its current and future student population and to develop a schematic design to provide an adequate estimate of total project cost.  The overview of phase 1 describes the development of the recommendation to proceed with design of a new facility.  Full details are in the architect's final report of HMFH Architects and Turner Construction, both on line and at the Wayland Public Library .  A fact sheet summarizes the recommendation.  There is also a complete analysis of tax impact.  A brochure (pdf, 1MB) was sent to all residents, and the warrant for the Special Town Meeting contains the HSBC's final phase-1 report.
  2. Phase 2: Design drawings and bidding (Feb 2005-Mar 2006 On hold)**
  3. Phase 3: construction (May 2006-Aug 2009 On hold)
**Debt-exclusion vote to allocate funds ($4.232M) for Phase 2 failed at the polls on 2005 Jan 25 and Article 1 was passed over at the Special Town Meeting on 2005 Jan 27.
Feb 05
Posted survey results (pdf, 1.2MB) , 50-page document as html and pdf (1.2 MB)
Posted approved minutes of the May 19, 2005 meeting.
9 Dec 05
Posted agenda for HSBC meeting #35
6 Dec 05
We thank everyone who filled out an HSBC survey.  Surveys were submitted by more than 2,000 citizens.   Most surveys were filled out on paper and returned by mail, with only about 100 submitted on-line.  Volunteers are entering data and typing up comments.  We expect to present a preliminary analysis in December. 4 Nov 05
Posted the 2005-01-25 election results and updated schedule
Question #1 on the Special Election ballot

  "Shall the Town of Wayland be allowed to exempt from the provisions of proposition two and one-half, so-called, the amounts required to pay for the bond issued in order to fund design services, including, but not limited to site testing and analyses and other required services to complete contract documents and receive bids for the new construction and renovation of the Wayland High School?"

Precinct
1
2
3
4
All
Blanks
0
0
0
0
0
Yes
600
393
394
618
2005
No
553
817
638
637
2645
% Yes
52%
32%
38%
49%
43%
Totals
1153
1210
1032
1255
4650
# of registered voters
2201
2205
2095
2397
8898
% voting
52%
55%
49%
52%
52%
8 Feb 05
Posted the pdf (1MB) of the brochure mailed to all residents.  Posted the comments from the 2004-12-16 forum and the 2005-01-08 forum.
15 Jan 2005
Posted the fact sheets on phase 1, phase 2, the tax impact .  Added the nifty heading of existing and proposed site plans.  (technical: got Jeff's help in improving format)
19 Dec 04
Updated HSBC Final Report of Phase 1.  Added pdf (0.5MB) version, which is identical to the appendix in STM Warrant.  The inclusion of the report was approved by the Board of Selectmen on 13 Dec 2004 by a vote of 3-1-1.
18 Dec 04
Posted the Preliminary Design Report (That's report on the preliminary design.) by HMFH and Turner as a set of pdf documents.  The entire report is 4.1 MB.  The individual chapters are arranged in alphabetical order in a directory.  This is the final report of Phase 1 by the architects and the project manager.  A briefer version of this report will become the final report for phase 1 by the HSBC.
Posted the minutes of the 2004 Nov 10 meetin g and the  minutes of the 2004 Nov 18 meeting .
28 Nov 04
Updated phase-1 overview.  Added minutes of 2004-10-28 meeting .
11 Nov 04
Added overview of phase 1 .  Added approved minutes of meetings #18(1 July 04) , #23(19 Aug 04) , #24(9 Sep 04) , and #27(14 Oct 04) .
31 Oct 04
The Board of Selectmen passed the following motion on Monday 25 Oct 2004: “I move that the Board call a Special Town Meeting to be held on January 27, 2005, be scheduled to begin at 7:45 p.m. at Wayland High School Field House and that the time period for the submission of articles to be included in the warrant for said Special Town Meeting shall begin on Tuesday, October 19, 2004 at 8:30 a.m. and shall end on close on Tuesday, October 26, 2004 at 4:30 p.m.”  Text of ballot question and STM article .
28 Oct 04
The cost details of a stop-gap project were presented on 14 Oct 04.  Assuming reimbursement for the option 3 project, the stop-gap project costs nearly ($33.0M) as much as the proposed entire project ($32-39M), would provide increased space and upgrades of existing buildings but not many important elements considered necessary, including enlarged classrooms and commons, enlarged arts and improved athletics facilities, and would cause disruption over a longer period.
28 Oct 04
Approved minutes for 23 Sep meeting posted
12 Oct 04
Note revisions of schedule above.  No meeting on 30 Sep 04.
23 Sep 04
Questions and Answers from 26 Aug 04 Public Forum
21 Sep 04
Agenda for Public Forum on 26 Aug 04 in the HS Little Theater
6:30
High School Tour starts in Commons Charlie Ruopp, Principal, Wayland High School
7:30
Welcome and Introduction
w
Lea Anderson, Chairperson, HSBC
7:35
Educational Program Priorities
Charlie Ruopp, WHS Principal
7:45
Review of Three Options and Costs
HMFH Architects
7:55 Update on HSBC Analysis and Options Selection
Lea Anderson, Chairperson, HSBC
8:15
Update on Financial Analysis
Mary Lentz
8:20
Update on SBA Legislation
Jeff Dieffenbach
8:30
Comments and public input

18 Aug 04
At the 5 Aug meeting, the HSBC chose to pursue option 3 (new construction and a renovated Field House).  Posted the draft minutes for regular meeting of 5 Aug 04, written comments of Joe Lewin , Fred Knight , and Steve Tise on option selection, and commentary that appeared in the Town Crier.
15 Aug 04
Posted approved minutes for regular meeting of 29 Jul 04
15 Aug 04
Posted approved minutes for regular meeting of 22 Jul 04 30 Jul 04
Gov. Romney signed the SBA reform bill on 28 Jul 2004.  Boston Globe article Massachusetts Municipal Association commentary .
29 Jul 04
Posted the final version of the SBA reform bill that has been approved by the House and Senate.  This bill will become law on 29 Jul 04 unless it is vetoed by the Governor.  The posted version has sections relevant to Wayland's situation highlighted in red.  In brief, the moratorium on school reimbursement continues until 2007, but a community that goes ahead with construction is still eligible to apply for reimbursement starting in July 2007 (Section 53).  The loan repayment period is extended to 25 (Section 21(d)) or 30 (Section 51 ) years, and the period of a temporary loan remains at 7 years of the 30 (Section 51 ).  Finally, the minimum reimbursement rate is set to 40% (Sections 29 and 30) but is calculated by a formula already contained in Section 10 of General Laws Chapter 40B .  That formula is amended in the reform bill to have a base percentage reduced from 39% to 31% (Section 31) and to eliminate the 2% addition for using a project manager (Section 32).  Wayland's reimbursement percentage rate could still rise above 40% if the total of "Incentive Percentage Points" is above 9% (40% - 31% base percentage).  The Incentive Percentage Points are having excellent maintenance (+8%), incorporating reconstruction (+4%), having innovative community use (+3%), using energy efficiency that meets industry standards (+3%), and finding non-state funding (+0.5% for each 1% raised).
25 Jul 04
Posted approved minutes for regular meeting of 15 Jul 04 23 Jul 04
Details of costs (pdf) for three families of options 14 Jul 04
HMFH Architects prepared the proposed  Educational Program Specification (pdf ,Excel) for Wayland High School, which consists of a narrative and two tables.  An overview summarizes the specification, describes its purpose and use, and highlights the key assumptions and characteristics behind its creation.
14 Jul 04
Posted Questions and Answers from 8 Jul 2004 Public Forum
13 Jul 04
Created Press Releases directory
11 Jul 04
Posted material from Public Forum on 8 Jul 04.
Letter to Town Crier announcing the public forum.
6:30
High School Tour starts in Commons Charlie Ruopp, Principal, Wayland High School
7:30
Welcome and Status Update, L1
w
Lea Anderson, Chairperson, HSBC

Presentations 1.-10.


1.Introduction to Process
George Metzger, HMFH Architects

2.Existing Conditions
Doug Sacra, HMFH Architects

3.Existing Program
Charlie Ruopp, WHS Principal

4.Educational Program Steve Friedlaender, HMFH Architects

5.Families of Options
Doug Sacra, HMFH Architects

6.Comparison of Options
George Metzger, HMFH Architects

7.Phasing of Options
Julie Bezoet de Bie, Turner Construction Co.

8.Cost of Options
Dick Amster, Turner Construction Co.

9.Benchmarking
Doug Sacra, HMFH Architects

10.Schedule
Dick Amster, Turner Construction Co.

Future of State Reimbursement
Jeff Sterns, Deputy State Treasurer

Questions and Answers

10 Jul 04
Posted approved minutes of 17 and 24 Jun 04 meetings , Senate version of SBA reform bill
3 Jul 04
Posted approved minutes for regular meeting of 10 Jun 04 22 Jun 04
Posted approved minutes for regular meeting of 3 Jun 04 11 Jun 04
Posted draft material on existing conditions .  Material is in pdf files: one for each section and one for the entire report (5 MB, 242 pages).  Page numbering is consecutive, not by sections. 5 Jun 04
Posted approved minutes for regular meeting of 27 May 04 4 Jun 04
Posted House Bill No. 4749: pdf.  This bill to reform SBA funding passed in the House in late May 2004.  Section 46 of this bill specifies the reimbursement conditions for projects that commence before the implementation of the School Building Assistance Trust (2007).  Currently, this bill is being considered in the State Senate.
4 Jun 04
Posted draft Educational Program (html ,Excel) 2 Jun 04
Posted approved minutes for regular meeting of 20 May 04 28 May 04
Posted approved minutes for regular meeting of 13 May 04 21 May 04
Posted approved minutes for regular meeting of 15 Apr 04 and Goals for Phase 1
14 May 04
Posted HSBC report from Town Meeting
2 May 04
Posted approved minutes for regular meeting of 8 Apr 04 25 Apr 04
Posted approved minutes for regular meeting of 1 Apr 04
9 Apr 04
Posted approved minutes for regular meeting of 11 Mar 04 and first forum on 25 Mar 04
3 Apr 2004
Created new sections
28 Mar 2004
HSBC Information Sessions at Wayland High School, L1
Date
Time
Topic
Presenters
7 April 2004
7:30-9:30pm
Green, High-Performance Schools
HMFH Architects
15 April 2004
6:30-7:30pm
The Effect of the Existing Facility on the Quality of the Educational Program
Charlie Ruopp, WHS Principal
Doug Sacra, HMFH Architects
20 May 2004
6:30-7:30pm Construction Challenges for Public Buildings
Turner Construction Co. , HMFH Architects
TBA
TBA
Best Practices
TBA
27 Mar 2004
First Community Forum : Thursday evening, 25 Mar 04
6:30
High School Tour starts in Commons
Charlie Ruopp, Principal, Wayland High School
7:30
Welcome and Status Update, L1
w
Lea Anderson, Chairperson, HSBC
7:45
Highlights of Educational Program Charlie Ruopp
8:10
Meet the Architects George Metzger, HMFH Architects
8:15
Meet the Project Managers Dick Amster, Turner Construction Company
8:20
Plans for the Coming Months Lea Anderson
8:30
Question and Answer Period
13 Mar 2004
Next meeting (#7, agenda) is scheduled for Thursday, 11 Mar 04 at 7:30 in the School Committee room at the Town Building.
9 Mar 2004
Next meeting (Agenda) is scheduled for Thursday, 26 Feb 04 at 7:30 in the Conference Room at the High School Commons (not at the Town Building).  An earlier meeting (Agenda) with the architects is scheduled for 6pm at the same location before the full HSBC meets. 24 Feb 2004
Agenda and minutes of meeting with HMFH on 17 Feb 04
19 Feb 2004
Minutes of 5 Feb 04 meeting.  Minutes of 11 Feb 04 meeting.  Architects ranked at 12 Feb 2004 meeting: 1. HMFH  2. TDPC  3. SMMA  4. OMR.  Negotiations proceeding with meeting at the School Committee Room at the Town Building at 7:30pm on 17 Feb 2004.
17 Feb 2004
Architect interviews at the School Committee Room at the Town Building
Wednesday, 11 Feb 04, Agenda
Thursday, 12 Feb 04, Agenda
7:30-8:30 SMMA
7:15-8:15 TDPC
8:45-9:45 OMR
8:30-9:30 HMFH
8 Feb 2004
Minutes of 29 Jan 2004 meeting.
8 Feb 2004
Third meeting: 5 Feb 2004, 7:30 pm at the School Committee Room at the Town Building, agenda 3 Feb 2004
Designing and Constructing Public Facilities , written by the Office of the Inspector General 31 Jan 2004
Minutes of 22 Jan 2004 meeting
30 Jan 2004
Second meeting: 29 Jan 2004, 7:00 pm at the School Committee Room at the Town Building, agenda
27 Jan 2004
First meeting: 22 Jan 2004, 7:30 pm at the High School Commons, agenda
17 Jan 2004
Appointees are Lea Anderson (chair), Josh Bekenstein, Dianne Bladon, Steve Breit, Brian Chase, Jim Howard, Mary Lentz (by BoS), Joe Lewin, Cindy Lombardo, Eric Sheffels (by FinCom), and Steve Tise
17 Jan 2004
Charge to High School Building Committee: pdfhtml
Charge approved on 5 January 2004.
6 Jan 2004
Request for Quotation (RFQ) to architects: MSWord , pdf
RFQ for Project Manager: MSWord, pdf
Bidder presentation 18 December 2003, 11 am, Little Theatre, WHS.
11 Dec 2003
Invitation to join the High School Building Committee
Application for High School Building Committee:
      PDF (to be filled in and sent) ,
      MSWord (to edit and send electronically)
Deadline for HSBC applications is 31 December 2003.
9 Dec 2003
The Wayland School Committee offers its heartfelt gratitude to everyone who considered and voted on the operating override and high school questions. Thank you very much for your time and effort.
Special Town Meeting Articles
Passed?
4: Fund next phase for $355,000 (vote: 964-373, 72%)
Yes
5: Form High School Building Committee
Yes
6: Petition Legislature to allow borrowing for 30-year term
Yes
24 Nov 2003
Get the Facts on the high school project: MSWord, pdf, html
14 Nov 2003
High School Study Committee: report | home page | discussion board 19 Jun 2003
Wayland High School Feasibility Study: summary | full report 21 Nov 2002